Commercial & Industrial Solar EPC From Panels to 11kV Substation
TransfoLine delivers complete, single-window 100 kW to 5 MW industrial on-grid solar power plants across Pakistan. We manufacture the step-up transformers, build the 11kV VCB switchgear, supply Tier-1 panels and string inverters, and handle 100% turnkey NEPRA bi-directional net-metering approvals.
Industrial Solar Sizing & Savings Calculator
Estimate your required system capacity, annual tariff savings, and capital payback period.
The complete industrial renewable power train.
From Tier-1 photovoltaic modules to medium-voltage 11kV grid synchronization, TransfoLine eliminates third-party contractor dependencies.
Standard industrial solar configurations & pricing.
| System Capacity | Inverter & Step-Up Match | Annual Units Generated | Typical Annual Savings | Target Facility |
|---|---|---|---|---|
| 100 kW Commercial | 100kW On-Grid Inverter / LT Sync | 140,000+ kWh | PKR 7.2 Million | Plazas, hospitals, fuel stations, cold storage |
| 500 kW Industrial | 630 kVA (0.8kV/11kV) Transformer | 700,000+ kWh | PKR 36.4 Million | Flour mills, plastics, auto parts, ceramics |
| 1.0 MW Industrial Substation | 1250 kVA Dual-Secondary Split Transformer | 1,420,000+ kWh | PKR 73.8 Million | Textile spinning, weaving, steel re-rolling |
| 2.0 MW ā 5.0 MW Mega Plant | 2.5 MVA ā 6 MVA Multi-Inverter Substation | 2.8M ā 7.1M kWh | PKR 145M ā 360M | Composite textile parks, SEZ industrial zones |
Industrial Solar EPC FAQ.
Answers to common questions regarding industrial rooftop solar, equipment guarantees, and net-metering approvals in Pakistan.
HARDWARE Which solar panel brands does TransfoLine supply?
TransfoLine exclusively supplies Bloomberg NEF Tier-1 certified N-Type TopCon and Bifacial solar modules from global leaders including Jinko Solar (Tiger Neo), Longi Solar (Hi-MO X6/X7), and Canadian Solar, backed by 12-year product and 25-year linear performance warranties.
TRANSFORMER Why does TransfoLine manufacture its own step-up transformers?
Standard distribution transformers overheat and fail on solar loads due to inverter PWM harmonics and DC bias. TransfoLine builds specialized K-9 rated copper transformers with electrostatic Faraday shielding, ensuring seamless 30-year operational life with zero harmonic breakdown.
NET-METERING How long does the NEPRA net-metering process take?
From initial 11kV feeder load flow study submission to final DISCO bi-directional green meter installation and commercial COD, TransfoLine completes the entire turnkey regulatory process in 45 to 60 days.
MAINTENANCE What after-sales maintenance support is provided?
Every TransfoLine industrial solar project includes a complimentary 12-month Operation & Maintenance (O&M) contract with monthly drone thermal imaging inspections, inverter diagnostic logs, transformer oil BDV testing, and 24/7 on-site emergency support.
Ready to Slash Factory Electricity Costs by 85%?